Skip to content

Products

Steel Scaffolding Components

Galvanised and painted steel scaffolding components — ledgers, H frames, intermediate transoms, cup lock standards, and prop jacks and push-pull props.

Blue steel cup lock scaffold frame with adjustable screw jacks at the base and U-heads at the top, photographed on a white background.

Specifications: Component specifications (sizes, load ratings, coatings and standards) are not published on the current site and are needed before launch.

Ledgers

Horizontal members that connect the standards and carry the working platform along a scaffold run.

Steel tube with welded end fittings at both ends, so a joint lands the same way along the whole run.

Used with standards and transoms, they complete the load path from the deck to the ground and keep the frame rigid.

Three galvanised steel ledgers of different lengths, each with an end fitting at both ends, photographed against a white background.

H Frames

Prefabricated frame units for scaffold systems where speed of erection matters more than fully modular adjustment.

Heavy-duty structural steel sections with reinforced joints, supplied powder-coated or galvanised depending on the site.

Commonly specified for facade work and repetitive bay widths, where a frame system reduces assembly time per lift.

Two blue-painted steel H frames with diagonal cross bracing and built-in access rungs, shown against a white background.

Intermediate Transom

Intermediate transoms sit between the main transoms to add deck support where the platform spans are longer.

Steel tubing with secure end fittings transfers the deck load back into the standards and reduces deflection under footfall and stacked materials.

Used on working lifts that carry heavier loads or where boards need closer spacing.

Three blue-painted steel transoms of different lengths, each with an end fitting at both ends, photographed against a white background.

Cup Lock Standard

A modular system standard with a fixed lower cup and a movable upper cup, so members lock at the node with a single hammer action.

Assembly is fast because no separate couplers are needed at each connection, and the node carries high load capacity.

Suited to access scaffolds and shoring where the same system has to be reconfigured between lifts.

Six hot-dip galvanised cup lock standards of different lengths, each with a fixed lower cup at intervals, shown against a white background.

Prop Jacks & Push-Pull Props

Adjustable props used vertically or diagonally to support formwork and to brace members under erection.

Precision threading gives fine height adjustment, and the corrosion-resistant finish suits repeated site use.

Supplied with the matching couplers and threaded tube shown in our product range.

Galvanised adjustable prop jack with a threaded collar and top and base plates, shown beside a threaded coupler, a U-head pin and a threaded tube on a white background.

Services

Supply is only part of the job: the same team can design the access, install it, support it while it is in use and take it down.

  • 01

    Scaffolding Rental & Sales

    Scaffolding systems for hire or purchase, with quantities matched to the programme and delivery to site.

    • Scaffolding systems for hire, for sale, or a mix of both across a project
    • Quantities estimated from your drawings or a site inspection
    • Delivery to site and collection after dismantling
    Read the service
  • 02

    Erection, Supervision & Dismantling

    On-site erection, supervision during use, and dismantling by trained scaffolders.

    • Erection by trained scaffolding teams to the agreed design
    • Supervision while the scaffold is in use
    • Dismantling and removal from site, coordinated with your programme
    Read the service
  • 03

    In-House Steel Fabrication

    Custom-engineered scaffold and formwork steelwork produced in our own warehouse, in steel and aluminium.

    • Custom scaffold components where standard items do not suit the structure
    • Formwork and shuttering elements fabricated to the project's drawings
    • Steel and aluminium fabrication
    Read the service

Tell us the structure and the access you need

Send the drawings, or describe the job and the height involved, and we will come back with a material list and a quotation — for hire, purchase, or both.

Direct contact

By phone is still the fastest way to reach the sales team.