Can the scaffold carry items that are being installed?
The configuration is planned for the installation sequence, so the access carries both the trades and the load they are installing rather than only the people on it.
Ajman Industrial 2, Ajman, United Arab Emirates
Industries
Scaffold access for mechanical erection — equipment, ducting, pipework and supports.
Services used hereSteel FabricationSupport & Maintenance
Mechanical erection means heavy, irregular items arriving at height, and the access has to carry both the trades and the load they are installing.
Steel systems with the configuration planned for the installation sequence, plus fabricated supports where the structure itself does not give a fixing point.
Custom-engineered scaffold and formwork steelwork produced in our own warehouse, in steel and aluminium.
Heavy-duty scaffold support and ongoing maintenance attendance for plant, structures and long-running access requirements.

Steel scaffolding systems and components manufactured in Ajman — cup lock standards, ledgers, H frames, intermediate transoms, and prop jacks and push-pull props.
View the category
Formwork and shuttering materials for concrete work — panels, props and the support components that hold a pour in place.
View the categoryQuestions
The configuration is planned for the installation sequence, so the access carries both the trades and the load they are installing rather than only the people on it.
Supports are fabricated in-house for the cases where the structure itself gives no natural fixing point, which is usually what a mechanical erection needs.
Tell us the products, quantities and sizes you need, or send the drawings, and we will come back with a material list and a quotation — for purchase, hire or both. Enquiries from contractors, distributors and buyers outside the UAE are welcome.
Direct contact
By phone is still the fastest way to reach the sales team.