Where does a scaffolding job start?
With the access requirement: what has to be reached, what loads the platform carries and how long the scaffold stays up. Quantities come from your drawings or the site inspection.
Ajman Industrial 2, Ajman, United Arab Emirates
The GH Scaffold System
Our five-step delivery process: site inspection, design and material planning, supply, installation, and support while the scaffold is in use.
Five steps
The same five steps apply whether the job is a single access tower or a refinery turnaround — the detail scales with the structure.
We look at the structure, the ground, the work that has to be reached and the way the site is operating.
The inspection establishes what access the job actually needs, before any material is ordered.
The access is designed around the structure: working loads, leg loads, tie positions and the configuration of the lifts.
The material list is drawn from the design, so quantities match the work rather than a round figure.
Scaffolding components, pipes and tubes and formwork are supplied from stock, for hire or for purchase.
Deliveries are phased to the programme so that material does not sit on site longer than it is needed.

Trained teams erect the scaffold to the agreed design, with supervision during the work.
Handover is carried out before the working platforms are used by other trades.
The scaffold is inspected and adjusted while it is in use, as the work front moves or the requirement changes.
Dismantling and collection are planned so that the access comes down as the work finishes rather than being left standing.
Questions
With the access requirement: what has to be reached, what loads the platform carries and how long the scaffold stays up. Quantities come from your drawings or the site inspection.
Trained teams erect it to the agreed design and it is handed over before other trades use the platforms; dismantling and collection are planned so the access comes down as the work finishes.
Yes — the scaffold is inspected and adjusted while it is in use, as the work front moves or the requirement changes.
Tell us the products, quantities and sizes you need, or send the drawings, and we will come back with a material list and a quotation — for purchase, hire or both. Enquiries from contractors, distributors and buyers outside the UAE are welcome.