Why the request decides the quotation
A supplier can only price what it is told. When a request is vague, each supplier fills the gaps differently — one assumes delivery is included, another does not; one quotes a lighter tube, another the specified one — and the quotations that come back cannot be compared.
A clear request for quotation (RFQ) removes most of that guesswork. It takes longer to prepare than a one-line email, but it saves the clarification rounds that follow a vague one, and it makes the eventual order easier to check on delivery.
Company and project details
Start with who is asking and for what. The supplier needs enough to understand the context and to send the quotation to the right person:
- Company name, contact person, phone and email.
- Project name and location, and the type of structure or plant.
- Your role on the project — main contractor, subcontractor, scaffolding contractor, owner.
- Whether the material is for hire, purchase or both.
Material descriptions and quantities
This is the heart of the request. The best basis is an approved material list from the scaffold design, with its revision number. Failing that, send the drawings and let the supplier take off the quantities; failing that, describe what has to be reached, how high, for how long and what the platforms will carry.
For each line, give the specification as your project states it — material, finish and dimensions — rather than a trade description. List components separately: tubes by length, each coupler type, boards, bases, guardrails, toe boards, ties and access. If the job is phased, give quantities per phase.
Required documentation
If documents must accompany the material, say so in the request rather than after the order. List each one your contract or client requires, for example:
- Material certificates or test reports, if your specification calls for them.
- Delivery notes listing each item and quantity.
- Any inspection or condition records required for hired material.
- Anything your client or site requires before material can enter the site.
Delivery dates and site arrangements
Delivery details change the price and the feasibility of an order, so include them:
- Delivery address and any access restrictions — gate times, vehicle limits, permits.
- Required dates, or the programme milestones deliveries must follow.
- Who unloads, and with what equipment.
- Laydown space available on site.
- For hire: the expected hire period and how collection will be arranged.
Substitutions and specification questions
Decide in advance whether alternatives are acceptable. If they are, ask suppliers to show any substitute as a separate, clearly marked line with the reason — so it can be checked by the person responsible for the design rather than discovered on delivery.
Invite questions with a deadline. A supplier that asks about an ambiguous line is helping you; the answer should be shared with every supplier on the list so the quotations stay comparable.
A sample RFQ structure
A simple structure that works for most scaffolding material requests:
- 1. Requester: company, contact, role on the project.
- 2. Project: name, location, structure, programme.
- 3. Scope: hire, purchase or both; supply only or with design or erection.
- 4. Materials: material list or drawings with revision; specification per line; quantities per phase.
- 5. Documents: what must accompany the material.
- 6. Delivery: address, access, dates, unloading, laydown; hire period if relevant.
- 7. Alternatives: whether substitutes are accepted and how to show them.
- 8. Response: what the quotation must state, the deadline and who to send it to.
Mistakes that weaken a request for quotation
- Quantities from an early estimate rather than the approved design.
- Trade descriptions such as "standard tube" in place of a specification.
- Documentation requirements left out, then added after the order.
- No delivery details, so each supplier prices a different assumption.
- Different information sent to different suppliers, so the replies cannot be compared.
Sending a prepared enquiry to GH Scaffolds
GH Scaffolds supplies scaffolding products for hire or purchase from Ajman Industrial 2 and replies with a material list and a quotation. The enquiry form on the contact page takes your name, email, phone, company, the service you are interested in and the project details, and accepts drawings or photographs — so a prepared RFQ can be sent in one go. Enquiries from contractors, distributors and buyers outside the UAE are welcome, and the sales team can also be reached by phone.