Introduction
Editorial draft — final copy not yet written
What has changed on site over the last decade of scaffold practice.
Modular systems
Editorial draft — final copy not yet written
Cup lock and frame systems compared with tube-and-fitting assembly.
Design before erection
Editorial draft — final copy not yet written
Why load planning and drawings now come first, and what it saves.
Material flow
Editorial draft — final copy not yet written
Delivering and collecting material to match the programme instead of storing it on site.
Conclusion
Editorial draft — final copy not yet written
What to ask a scaffolding contractor for before work starts.



